Is Your Straightener Feeder Losing Length as It Warms?
The first-article check passes at 06:40. By 09:00 the same setting is running 0.11 mm long, and nobody has touched a dial.
Nothing has failed. The line has warmed up, and every part of it grew at a different rate while the run continued.
An NC straightener feeder is a stack of steel, cast iron and oil that starts the shift at shop temperature and ends it 10 to 15 °C warmer. Feed length follows.
This diagnostic separates the four sources of that movement, gives the arithmetic on a real 1.2 mm job, and sets out a routine that holds tolerance from the first part.
Machine masses and frame lengths per model are listed in the machine data sheets.
What Ninety Minutes of Running Does to a 300 mm Feed
A 300 mm feed on a 1.2 mm SPCC job, tolerance plus or minus 0.05 mm. That is a 0.017 percent band, and steel moves more than that for a 3 °C change.
The drift is not random. It is directional, repeatable and it stops once the machine reaches thermal equilibrium, usually 60 to 120 minutes into the shift.
Direction tells you the source. A feed that gets longer as the line warms points at the strip or the clamp. A feed that gets shorter points at the die growing between the pilot and the cut.
Both can be present at once, which is why the first hour of a shift often shows a wander rather than a trend.
Four Sources of Growth, Largest First
The first source is the strip itself. A coil stored in an unheated bay arrives at 8 °C and reaches shop temperature within minutes of being uncoiled.
Steel expands 11.5 µm per metre per degree. Three hundred millimetres of strip warming 16 °C grows 0.055 mm, which is the whole tolerance band on this job.
The second source is the die. A progressive die running at 120 SPM stabilises 8 to 12 °C above ambient, and 800 mm of die block grows 0.07 to 0.11 mm between the pilot station and the cut.
The third is the clamp and the roll surface. Hydraulic oil at 12 °C is three times as viscous as at 45 °C, and clamp force on the same pressure setting rises 8 to 12 percent as the oil thins.
The fourth is the feed roll. An 84 mm roll growing 12 °C adds 0.036 mm to its circumference, which is 0.012 percent of a 300 mm feed. Real, and an order of magnitude smaller than the first three.
Measuring Drift With a Square and a Dial
You do not need a metrology lab. You need the same measurement taken six times across the first two hours, with the ambient temperature written next to it.
Measure from a fixed datum on the strip to a fixed feature, not from the die. Measuring from the die includes the die growth and hides which source moved.
Cut 10 parts at 06:30, 07:00, 07:30, 08:00, 08:30 and 09:00. Measure all sixty on a surface plate with a height gauge and write the spread against time.
A curve that flattens by 08:00 is thermal. A curve that keeps climbing is slip, and slip has a different fix entirely.
- Record shop temperature at each sample, not the temperature at the control panel
- Use the same datum feature on every part; a different edge makes the data unusable
- Note the coil temperature at loading; a cold coil is a separate source with its own decay
- Log the hydraulic oil temperature; it explains clamp drift that the strip cannot
The Numbers on a 1.2 mm SPCC Job
| Source | Movement over 90 min | Effect on a 300 mm feed | Where it costs you |
|---|---|---|---|
| Strip warming 8 to 24 °C | 0.055 mm of growth | First parts come up short, then correct themselves | Scrap in the first hour that nobody traces to temperature |
| Die warming 10 °C over 800 mm | 0.092 mm pilot to cut | The pilot pulls the strip forward, so the error hides in the hole position | Hole-to-edge dimensions drift while feed length looks correct |
| Hydraulic oil 12 to 45 °C | Clamp force up 8 to 12 percent | Slip falls, so measured feed gets longer through the shift | First-article offset changes with the weather, not with the job |
| Feed roll at 84 mm | 0.036 mm per revolution | 0.012 percent of the feed, or 0.036 mm | Negligible against the other three until the tolerance is under 0.03 mm |
The second row is the one that sends teams to the wrong machine. Feed length measures correct all morning while the hole moves, because the pilot is doing the positioning.
Check it by measuring hole position relative to the strip edge rather than to the previous hole. If pitch is right and position is wrong, the feed is not the problem.
Why the Encoder Reports Nothing Wrong
The encoder counts motor revolutions. It is bolted to a shaft that stays within 2 °C of ambient and it reports position to four decimal places.
Everything that moves the part happens after the encoder. Roll contact, strip temperature, die growth and clamp force are all outside the loop the drive can see.
That is why the HMI shows a perfect 300.000 mm while the part is 0.11 mm long. The drive is not lying. It is answering a different question.
The measurement that closes the loop is on the part, and it has to be taken at the same point in the shift every day to be comparable.
A dial indicator on a magnetic base, set against the strip edge at the die entry, gives a second opinion within one stroke. If the dial shows 300 mm and the part measures 300.1, the error is after the die entry.
That single comparison splits the search in half, and it costs one indicator and two minutes at the start of the shift.
What a Warm-Up Routine Cannot Fix
A warm-up routine manages thermal movement. It does not remove it, and on some jobs it is not worth the parts it costs.
A die that grows 0.09 mm between pilot and cut will do so every morning. No routine changes that, and the fix belongs in the tool, not on the line.
Slip from a worn roll looks identical to thermal drift in the data and is not thermal at all. A 0.06 mm wear flat on an 84 mm roll changes the effective circumference by 0.38 mm.
Where the whole idea misleads is on loose tolerance work. On a plus or minus 0.2 mm bracket, none of this matters, and a warm-up routine costs more in idle time than the scrap it prevents.
It also fails on a line that stops for lunch. The die cools, the strip in the loop cools, and the afternoon restart repeats a smaller version of the morning curve.
A Routine That Holds 0.05 mm From the First Part
Start with the coil. Bring it into the shop the day before the run, or accept that the first hour is a settling period and schedule a cheap job into it.
Run 20 no-load strokes before threading. That warms the drive, the gearbox and the roll bearings without consuming strip, and it takes four minutes.
Thread, then run 10 parts to the scrap bin and measure them at the tenth. Adjust once, and only once, from that measurement.
Write the first-article number next to the shop temperature on the job card. After two weeks you have a correction table, and the correction is arithmetic rather than experience.
Season matters more than most plants expect. A line that holds 0.05 mm in August will drift 0.08 mm in February, because the incoming coil is colder and the shop is cooler at both ends of the shift.
Where the tolerance is tighter than 0.05 mm, add a pilot release check to the morning routine. The timing shift between a cold and a warm die is often larger than the feed drift it is meant to correct.
For the jobs where all four sources stack in the same direction, the answer is a die-side adjustment rather than a feed setting, and the error budget article linked below shows how to allocate it.

The wider budget, from coil to die, is set out in the feed accuracy error budget, which is the right frame before adjusting anything on the machine.

How much does 300 mm of strip grow when it warms 16 °C?
0.055 mm, using 11.5 µm per metre per degree. On a plus or minus 0.05 mm job that is the entire tolerance band before the die is counted.
Does a 0.05 mm feed error show up during a 90 minute warm-up?
Yes, and it usually shows as a trend rather than a step. Sampling 10 parts every 30 minutes makes the trend visible by the third sample.
Why does the encoder show the correct feed length while parts drift?
The encoder measures motor rotation. Strip temperature, die growth and clamp force all act after that point, so the drive reports a number the part never received.
Can a warm-up routine hold plus or minus 0.05 mm from the first part?
It can hold 0.05 mm after the first 20 parts on a 1.2 mm job. From the very first part it needs a temperature correction table, not a routine.
Where to go next
Thermal drift is one line in a longer budget. The others, from roll slip to pilot timing, are sized in the same document.
Size the rest of the budget